API Recently successfully inspected a pipeline to determine its current line and level. The pipeline was fully submerged, and was directionally drilled. Confirmation of the pipes location was required prior to final connection and commissioning.
The client had previously contacted 5 other pipe inspection companies, with no successful results. API utilised a specialist crawler unit with an inclinometer and super sonde to deliver the project.