A live and fully chlorinated CCTV survey was undertaken on a 6 inch Ductile and Cast Iron pipeline to identify and locate the cause of low water pressure issues. The cause was successfully identified as a pipe blockage and was traced and located above ground for the client. The survey was undertaken whilst the pipeline remained under normal operating conditions with no interruptions to clients supply.