• Home
  • About Us
  • API Services
    • Live Water Pipe Inspection
    • Depressurised Pipe Inspection
    • Specialist Leak Detection
    • Non-Destructive Testing (NDT)
    • Hydro Electric Plant Monitoring and Inspection
    • Other Services
  • Clients & Case Studies
  • Gallery
  • Latest News
  • Contact Us

London pipe blockage successfully located

Posted on February 8, 2014 by API

A live and fully chlorinated CCTV survey was undertaken on a 6 inch Ductile and Cast Iron pipeline to identify and locate the cause of low water pressure issues. The cause was successfully identified as a pipe blockage and was traced and located above ground for the client. The survey was undertaken whilst the pipeline remained under normal operating conditions with no interruptions to clients supply.

« Reservoir fed water main surveys Scotland
London pipe branch connection successfully located »

Menu

  • Water Pipe Inspection and Water Leak Detection
  • About Us
  • API Services
  • Clients and Case Studies
  • Latest News
  • Contact Us

Latest News

  • API Confirms new school water supply pipe is not ready for use!

    January 7, 2021
  • API adds reservoir and tank inspection surveys to its services using underwater drone

    December 9, 2020
  • API successfully completes pressurised chilled water main pipe inspections at a UK power plant

    November 19, 2020

Contact Details

ADVANCED PIPE INSPECTION UK LTD
Friar Gate Studios
Ford Street
Derby
DE1 1EE
United Kingdom

Tel: +44(0)1332 258361
Email: info@api-uk.com

© API (UK) Ltd 2021