Hydro Electric Plant Monitoring and Inspection

Water is a valuable source around the world for many reasons; however lost water in the world of hydro is also a loss of energy and in turn revenue.

API can undertake live CCTV and acoustic inspections on all pipeline assets and offer clients a full data report to test the pipeline for:

  • Corrosion
  • Leakage
  • Air pockets
  • Negative pressure zones
  • Hydraulic modelling
  • Loss of bore through pipe inversion (common in plastics/MDPE)
  • Debris and obstructions

Any of the above areas could reduce hydro output by a level of up to 50%, this in turn could see a revenue loss of millions of pounds to the operator.
API recommends a periodic test of hydro schemes every 3-5 years due to the natural aging process, change of climate and on-going corrosion and build-up of debris within the pipe line.

Call us NOW on +44 1332 270881

Talk to one of our specialists about your requirements